• Friction Pendulum Seismic Isolator for Bridge Construction
  • Friction Pendulum Seismic Isolator for Bridge Construction
  • Friction Pendulum Seismic Isolator for Bridge Construction
  • Friction Pendulum Seismic Isolator for Bridge Construction

Friction Pendulum Seismic Isolator for Bridge Construction

Application: Transportation
Certification: CCC, CE, ISO
Surface Treatment: Yes
Technics: Forged
Material: Metal
Type: Pendulum Type
Samples:
US$ 100/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Gold Member Since 2014

Suppliers with verified business licenses

Manufacturer/Factory

Basic Info.

Design Vertical Load
1000-70000kn
Longitudinal Displacement
+/-250mm
Transversal Displacement
+/-50mm
Structure
Friction Pendulum System Isolator
Activity
Multi Direction Movable Bearing
Usage
Beam Bridge, Highway Bridge, Railroad Bridge
Transport Package
as Request
Specification
AASHTO
Trademark
Haider
Origin
China
HS Code
4016999090
Production Capacity
1, 000, 000 Sets/Year

Product Description

Friction Pendulum Seismic Isolator for Bridge Construction

Haider Pendulum curved surface sliders are based on the working principle of a pendulum. 
They allow the horizontal displacement of structure,providing the required shift in the natural period of the structure. 
Once activated by an earthquake, the isolators will allow the decoupling of the supported structure from the ground motion. 
After the seismic event, the restoring force due to gravity will bring it back towards the centre position. 
The performance of the device mainly depends on its radius of curvature and the coefficient of friction.


Friction Pendulum Seismic Isolator for Bridge Construction


Friction Pendulum Seismic Isolator for Bridge ConstructionFriction Pendulum Seismic Isolator for Bridge ConstructionFriction Pendulum Seismic Isolator for Bridge ConstructionFriction Pendulum Seismic Isolator for Bridge Construction
 
FAQ(Frequently Asked Questions)
1. You are a trading company or manufacturer?
  -We are manufacturer, and have our own factory.
2. What certificate do you get?
  - ISO9001-2008;ISO14001-2004;
3. What is your MOQ?
  -1Set.
4. What is your delivery time when making mass production?
  -About 15 days, the actual time depends on your order quantity.
5. Can you do OEM?
  -Yes, we can. OEM is welcomed.
6. What is your sample policy?
  -We offer samples, and the buyer takes responsibility of the express charge.
7. How long will it take to prepare samples?  
 -About 3-4 working days.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now